{"id":19993,"date":"2025-12-14T07:31:24","date_gmt":"2025-12-14T07:31:24","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=19993"},"modified":"2025-12-14T07:31:24","modified_gmt":"2025-12-14T07:31:24","slug":"delivery-of-moss-tunnel-section","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=19993","title":{"rendered":"Delivery of Moss Tunnel section"},"content":{"rendered":"<p style=\"text-align: justify;\">Involving the northern part of the Sandbukta open-cut zone, the tunnel portal, as well as the northern stretch of the Moss Tunnel, a 1.4km section of the Moss Tunnel has been handed over to Norwegian rail operator Bane Nor by the MossIA joint venture.<\/p>\n<p style=\"text-align: justify;\">Also installation of drainage infrastructure, cable ducts, two technical buildings and landscaping on the surface, as well as preparations for the northern section of the track area, including foundations for track switches and light masts, has been completed by MossIA, comprising Acciona and Implenia.<\/p>\n<p style=\"text-align: justify;\">While the responsibility of designing and building 9km of the 10km project is up to this joint venture, the drill and blast construction has included scaling, shotcrete application, waterproofing, and cast in situ concrete.<\/p>\n<p style=\"text-align: justify;\">Including construction of two main tunnels, which are the 2.7km-long Moss Tunnel in the north and the 2.3km-long Carlberg Tunnel in the south, this new double-track railway runs through the municipality of Moss. Additionally, two escape tunnels are being constructed.<\/p>\n<p style=\"text-align: justify;\">With the aim of increasing capacity and reducing travel time on the \u00d8stfold line, this tunnel has been built that is part of the Sandbukta\u2013Moss\u2013S\u00e5stad railway. Also in order to promoting links between Norway\u2019s main cities and easing traffic congestion in Oslo\u2019s catchment area,Bane NOR\u2019s Intercity program is designed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Involving the northern part of the Sandbukta open-cut zone, the tunnel portal, as well as the northern stretch of the Moss Tunnel, a 1.4km section of the Moss Tunnel has been handed over to Norwegian rail operator Bane Nor by the MossIA joint venture. Also installation of drainage infrastructure, cable ducts, two technical buildings and landscaping on the surface, as well as preparations for the northern section of the track area, including foundations for track switches and light masts, has been completed by MossIA, comprising Acciona and Implenia. While the responsibility of designing and building 9km of the 10km project [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":19994,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[],"class_list":["post-19993","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Delivery of Moss Tunnel section - Tunnelingworld<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=19993\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Delivery of Moss Tunnel section - Tunnelingworld\" \/>\n<meta property=\"og:description\" content=\"Involving the northern part of the Sandbukta open-cut zone, the tunnel portal, as well as the northern stretch of the Moss Tunnel, a 1.4km section of the Moss Tunnel has been handed over to Norwegian rail operator Bane Nor by the MossIA joint venture. Also installation of drainage infrastructure, cable ducts, two technical buildings and landscaping on the surface, as well as preparations for the northern section of the track area, including foundations for track switches and light masts, has been completed by MossIA, comprising Acciona and Implenia. While the responsibility of designing and building 9km of the 10km project [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=19993\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-14T07:31:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/12\/Delivery-of-Moss-Tunnel-section-.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1532\" \/>\n\t<meta property=\"og:image:height\" content=\"866\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Delivery of Moss Tunnel section\",\"datePublished\":\"2025-12-14T07:31:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993\"},\"wordCount\":223,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Delivery-of-Moss-Tunnel-section-.png\",\"articleSection\":[\"Contract\\\/projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993\",\"name\":\"Delivery of Moss Tunnel section - Tunnelingworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Delivery-of-Moss-Tunnel-section-.png\",\"datePublished\":\"2025-12-14T07:31:24+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Delivery-of-Moss-Tunnel-section-.png\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Delivery-of-Moss-Tunnel-section-.png\",\"width\":1532,\"height\":866},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19993#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Delivery of Moss Tunnel section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Delivery of Moss Tunnel section - Tunnelingworld","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=19993","og_locale":"en_US","og_type":"article","og_title":"Delivery of Moss Tunnel section - Tunnelingworld","og_description":"Involving the northern part of the Sandbukta open-cut zone, the tunnel portal, as well as the northern stretch of the Moss Tunnel, a 1.4km section of the Moss Tunnel has been handed over to Norwegian rail operator Bane Nor by the MossIA joint venture. Also installation of drainage infrastructure, cable ducts, two technical buildings and landscaping on the surface, as well as preparations for the northern section of the track area, including foundations for track switches and light masts, has been completed by MossIA, comprising Acciona and Implenia. While the responsibility of designing and building 9km of the 10km project [&hellip;]","og_url":"https:\/\/tunnelingworld.com\/?p=19993","og_site_name":"Tunnelingworld","article_published_time":"2025-12-14T07:31:24+00:00","og_image":[{"width":1532,"height":866,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/12\/Delivery-of-Moss-Tunnel-section-.png","type":"image\/png"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=19993#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=19993"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Delivery of Moss Tunnel section","datePublished":"2025-12-14T07:31:24+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=19993"},"wordCount":223,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=19993#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/12\/Delivery-of-Moss-Tunnel-section-.png","articleSection":["Contract\/projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=19993","url":"https:\/\/tunnelingworld.com\/?p=19993","name":"Delivery of Moss Tunnel section - Tunnelingworld","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=19993#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=19993#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/12\/Delivery-of-Moss-Tunnel-section-.png","datePublished":"2025-12-14T07:31:24+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=19993#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=19993"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=19993#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/12\/Delivery-of-Moss-Tunnel-section-.png","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/12\/Delivery-of-Moss-Tunnel-section-.png","width":1532,"height":866},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=19993#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Delivery of Moss Tunnel section"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/19993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19993"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/19993\/revisions"}],"predecessor-version":[{"id":19995,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/19993\/revisions\/19995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/19994"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}