{"id":19836,"date":"2025-11-03T12:14:05","date_gmt":"2025-11-03T12:14:05","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=19836"},"modified":"2025-11-04T06:04:23","modified_gmt":"2025-11-04T06:04:23","slug":"bucharest-metro-line-6-progress-made-on-south-section","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=19836","title":{"rendered":"Bucharest Metro Line 6 &#8211; Progress made on South Section"},"content":{"rendered":"<p style=\"text-align: justify;\">While on the Magistrala 6 Metro Project (M6) in Bucharest, a Terratec EPB TBM is advancing through challenging sandy ground, steady progress is being made on this project<\/p>\n<p style=\"text-align: justify;\">In April 2025, excavation on part of the South Section,1 Mai \u2013 Tokyo contract was commenced by Terratec S67 and this machine has reached a daily consistent advance rate of almost 14m since the installation of the belt conveyor system.<\/p>\n<p style=\"text-align: justify;\">Due to existence of abrasive sandy soils and sections that pass beneath Her\u0103str\u0103u Lake, the alignment presents complex geological challenges and so it requires precise face pressure control and continuous monitoring. Despite the demanding conditions, the machine\u2019s performance has remained stable, supported by Terratec\u2019s on-site technical team.<\/p>\n<p style=\"text-align: justify;\">In order to ensuring maximum safety and efficiency, TBM S67 which originally refurbished for this assignment, features several enhancements.<\/p>\n<p style=\"text-align: justify;\">Field reports indicate moderate cutterhead wear at the centre, typical of sand-abrasive geology.<\/p>\n<p style=\"text-align: justify;\">Developing Bucharest\u2019s public transport network to one of the city\u2019s busiest travel corridors, the new Metro Line 6 is going to establish a vital underground connection between Gara de Nord and Henri Coand\u0103 International Airport and the full line will comprise 14.2km of twin tunnels and 12 new stations, connecting residential, business, and airport districts across the northern axis of the capital.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>While on the Magistrala 6 Metro Project (M6) in Bucharest, a Terratec EPB TBM is advancing through challenging sandy ground, steady progress is being made on this project In April 2025, excavation on part of the South Section,1 Mai \u2013 Tokyo contract was commenced by Terratec S67 and this machine has reached a daily consistent advance rate of almost 14m since the installation of the belt conveyor system. Due to existence of abrasive sandy soils and sections that pass beneath Her\u0103str\u0103u Lake, the alignment presents complex geological challenges and so it requires precise face pressure control and continuous monitoring. Despite [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":19837,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[5247,1308,5248,5249,47],"class_list":["post-19836","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","tag-bucharest-metro-line-6","tag-romania","tag-south-section","tag-tbm-s67","tag-tunneling","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bucharest Metro Line 6 - Progress made on South Section - Tunnelingworld<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=19836\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bucharest Metro Line 6 - Progress made on South Section - Tunnelingworld\" \/>\n<meta property=\"og:description\" content=\"While on the Magistrala 6 Metro Project (M6) in Bucharest, a Terratec EPB TBM is advancing through challenging sandy ground, steady progress is being made on this project In April 2025, excavation on part of the South Section,1 Mai \u2013 Tokyo contract was commenced by Terratec S67 and this machine has reached a daily consistent advance rate of almost 14m since the installation of the belt conveyor system. Due to existence of abrasive sandy soils and sections that pass beneath Her\u0103str\u0103u Lake, the alignment presents complex geological challenges and so it requires precise face pressure control and continuous monitoring. Despite [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=19836\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-03T12:14:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-04T06:04:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/11\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"776\" \/>\n\t<meta property=\"og:image:height\" content=\"437\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Bucharest Metro Line 6 &#8211; Progress made on South Section\",\"datePublished\":\"2025-11-03T12:14:05+00:00\",\"dateModified\":\"2025-11-04T06:04:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836\"},\"wordCount\":219,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg\",\"keywords\":[\"Bucharest Metro Line 6\",\"Romania\",\"South Section\",\"TBM S67\",\"Tunneling\"],\"articleSection\":[\"Contract\\\/projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836\",\"name\":\"Bucharest Metro Line 6 - Progress made on South Section - Tunnelingworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg\",\"datePublished\":\"2025-11-03T12:14:05+00:00\",\"dateModified\":\"2025-11-04T06:04:23+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg\",\"width\":776,\"height\":437},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=19836#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bucharest Metro Line 6 &#8211; Progress made on South Section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bucharest Metro Line 6 - Progress made on South Section - Tunnelingworld","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=19836","og_locale":"en_US","og_type":"article","og_title":"Bucharest Metro Line 6 - Progress made on South Section - Tunnelingworld","og_description":"While on the Magistrala 6 Metro Project (M6) in Bucharest, a Terratec EPB TBM is advancing through challenging sandy ground, steady progress is being made on this project In April 2025, excavation on part of the South Section,1 Mai \u2013 Tokyo contract was commenced by Terratec S67 and this machine has reached a daily consistent advance rate of almost 14m since the installation of the belt conveyor system. Due to existence of abrasive sandy soils and sections that pass beneath Her\u0103str\u0103u Lake, the alignment presents complex geological challenges and so it requires precise face pressure control and continuous monitoring. Despite [&hellip;]","og_url":"https:\/\/tunnelingworld.com\/?p=19836","og_site_name":"Tunnelingworld","article_published_time":"2025-11-03T12:14:05+00:00","article_modified_time":"2025-11-04T06:04:23+00:00","og_image":[{"width":776,"height":437,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/11\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=19836#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=19836"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Bucharest Metro Line 6 &#8211; Progress made on South Section","datePublished":"2025-11-03T12:14:05+00:00","dateModified":"2025-11-04T06:04:23+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=19836"},"wordCount":219,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=19836#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/11\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg","keywords":["Bucharest Metro Line 6","Romania","South Section","TBM S67","Tunneling"],"articleSection":["Contract\/projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=19836","url":"https:\/\/tunnelingworld.com\/?p=19836","name":"Bucharest Metro Line 6 - Progress made on South Section - Tunnelingworld","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=19836#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=19836#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/11\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg","datePublished":"2025-11-03T12:14:05+00:00","dateModified":"2025-11-04T06:04:23+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=19836#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=19836"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=19836#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/11\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/11\/Bucharest-Metro-Line-6_-Progress-made-on-South-Section.jpg","width":776,"height":437},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=19836#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Bucharest Metro Line 6 &#8211; Progress made on South Section"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/19836","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19836"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/19836\/revisions"}],"predecessor-version":[{"id":19838,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/19836\/revisions\/19838"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/19837"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19836"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19836"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}