{"id":18961,"date":"2025-04-28T05:49:47","date_gmt":"2025-04-28T05:49:47","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=18961"},"modified":"2025-04-28T05:49:47","modified_gmt":"2025-04-28T05:49:47","slug":"tangxing-technology-unveils-slurry-shield-tbm","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=18961","title":{"rendered":"Tangxing Technology unveils slurry shield TBM"},"content":{"rendered":"<p style=\"text-align: justify;\">Following that the shield TBM for the Songxian Second Sewage Relocation East Line Pipeline project has passed its Factory Acceptance Test, in the previous week a roll-off ceremony at Tangxing Technology\u2019s Trenchless Equipment Industrial Park\u00a0 was attended by industry leaders and guests.<\/p>\n<p style=\"text-align: justify;\">With a 3.82m diameter and 65m length, Hucheng No. 1 is due to undertake the shield stage excavation of the project.<\/p>\n<p style=\"text-align: justify;\">The project has a total length of 2.23km, primarily through composite strata including hard rock, fractured ground and clay.<\/p>\n<p style=\"text-align: justify;\">Also several key technological systems for Hucheng No. 1 has been designed by Tangxing\u2019s R&amp;D team to meet the project\u2019s demand, that includes the gate-type trolley to improve the TBM\u2019s stability and flexibility; a slurry circulation system to optimise the slurry separation and slag discharge; a multi-mode cooling system to ensure the safe operation of equipment during high loads; a multi-joint segment lifting system to enhance transport efficiency and safety; and an intelligent monitoring and control system to improve operational precision.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following that the shield TBM for the Songxian Second Sewage Relocation East Line Pipeline project has passed its Factory Acceptance Test, in the previous week a roll-off ceremony at Tangxing Technology\u2019s Trenchless Equipment Industrial Park\u00a0 was attended by industry leaders and guests. With a 3.82m diameter and 65m length, Hucheng No. 1 is due to undertake the shield stage excavation of the project. The project has a total length of 2.23km, primarily through composite strata including hard rock, fractured ground and clay. Also several key technological systems for Hucheng No. 1 has been designed by Tangxing\u2019s R&amp;D team to meet [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":18962,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[120,4804,4803,4805,47],"class_list":["post-18961","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-china","tag-hucheng-no-1","tag-songxian-second-sewage-relocation-east-line-pipeline","tag-tangxing-technology","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18961","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18961"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18961\/revisions"}],"predecessor-version":[{"id":18963,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18961\/revisions\/18963"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/18962"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}