{"id":18837,"date":"2025-04-05T05:31:42","date_gmt":"2025-04-05T05:31:42","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=18837"},"modified":"2025-04-05T05:31:42","modified_gmt":"2025-04-05T05:31:42","slug":"germany-assia-de-123","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=18837","title":{"rendered":"Germany, Assia &#8211; de\/123"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for Construction Supervision and Geotechnical Consulting\u00a0 in the Construction Phases 3 and 4 of the Riederwald Tunnel (1095m, 1025m) on the Federal Motorway A66 (Frankfurt\/Main &#8211; Hanau).<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this contract is 25 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/vergabe.autobahn.de\/NetServer\/TenderingProcedureDetails?\">here<\/a> and <a href=\"https:\/\/ted.europa.eu\/e\/notice\/-\/detail\/188541-2025\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<\/p>\n<p style=\"text-align: justify;\">Autobahn GmbH des Bundes &#8211; NL West, Montabaur<\/p>\n<p style=\"text-align: justify;\">Email: <a href=\"mailto:vergabe.west@autobahn.de\">vergabe.west@autobahn.de<\/a><\/p>\n<p style=\"text-align: justify;\">Deadline: 06\/05\/2025<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for Construction Supervision and Geotechnical Consulting\u00a0 in the Construction Phases 3 and 4 of the Riederwald Tunnel (1095m, 1025m) on the Federal Motorway A66 (Frankfurt\/Main &#8211; Hanau). The determined time duration for this contract is 25 months. The related tender documents are attached here and here. For further information, please contact: Autobahn GmbH des Bundes &#8211; NL West, Montabaur Email: vergabe.west@autobahn.de Deadline: 06\/05\/2025<\/p>\n","protected":false},"author":5,"featured_media":18838,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[4727,207,345,2797,204,47],"class_list":["post-18837","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-construction-supervision-and-geotechnical-consulting","tag-germany","tag-motorway","tag-riederwald-tunnel","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18837"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18837\/revisions"}],"predecessor-version":[{"id":18839,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18837\/revisions\/18839"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/18838"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}