{"id":18807,"date":"2025-03-15T12:14:20","date_gmt":"2025-03-15T12:14:20","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=18807"},"modified":"2025-03-15T12:14:20","modified_gmt":"2025-03-15T12:14:20","slug":"hanois-pilot-light-metro-line-3-breakthrough-by-ghella","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=18807","title":{"rendered":"Hanoi\u2019s Pilot Light Metro Line 3 &#8211; Breakthrough by Ghella"},"content":{"rendered":"<p style=\"text-align: justify;\">Being operated by Ghella,TBM Th\u1ea7n T\u1ed1c has arrived at Cat Linh Station (S10) on Hanoi\u2019s Pilot Light Metro Line 3.<\/p>\n<p style=\"text-align: justify;\">With more than 100m long and almost 850 tons weight, the Herrenknecht TBM&#8217;s breakthrough marks the halfway point of the TBM\u2019s tunnelling work in the Vietnamese capital.<\/p>\n<p style=\"text-align: justify;\">As Hanoi\u2019s first underground metro line, the Pilot Light Metro Line 3 with 12.5km length connects Nhon\u2014located in the Tay Tuu neighborhood of Nam Tu Liem district, in western Hanoi\u2014to Hanoi Station. It consists of 8.5km of elevated tracks, 4km of underground tunnels and the construction of four underground stations: Kim Ma Station, Cat Linh Station, Van Mieu Station, and Hanoi Station.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Being operated by Ghella,TBM Th\u1ea7n T\u1ed1c has arrived at Cat Linh Station (S10) on Hanoi\u2019s Pilot Light Metro Line 3. With more than 100m long and almost 850 tons weight, the Herrenknecht TBM&#8217;s breakthrough marks the halfway point of the TBM\u2019s tunnelling work in the Vietnamese capital. As Hanoi\u2019s first underground metro line, the Pilot Light Metro Line 3 with 12.5km length connects Nhon\u2014located in the Tay Tuu neighborhood of Nam Tu Liem district, in western Hanoi\u2014to Hanoi Station. It consists of 8.5km of elevated tracks, 4km of underground tunnels and the construction of four underground stations: Kim Ma Station, [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":18808,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[1645,4718,4719,47,1182],"class_list":["post-18807","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","tag-ghella","tag-hanois-pilot-light-metro-line-3","tag-tbm-than-toc","tag-tunneling","tag-vietnam","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18807","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18807"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18807\/revisions"}],"predecessor-version":[{"id":18809,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18807\/revisions\/18809"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/18808"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}