{"id":18511,"date":"2025-01-11T10:38:02","date_gmt":"2025-01-11T10:38:02","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=18511"},"modified":"2025-01-11T10:38:02","modified_gmt":"2025-01-11T10:38:02","slug":"italys-santomarco-tunnel-project-fs-group-issues-e1-6bn-tender","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=18511","title":{"rendered":"Italy\u2019s Santomarco Tunnel Project &#8211; FS Group issues \u20ac1.6bn tender"},"content":{"rendered":"<p style=\"text-align: justify;\">As part of the renovation of Italy\u2019s railway system, for construction of the Santomarco Tunnel a tender worth more than \u20ac1.6bn has been launched by Rete Ferroviaria Italiana (FS Group).<\/p>\n<p style=\"text-align: justify;\">The aim of this project is to boosting connections between Salerno and Reggio Calabria.<\/p>\n<p style=\"text-align: justify;\">Delivering a 22km double-track line between Paola and Cosenza, including 17km of underground route through the Santomarco Tunnel, will be the responsibility of a winning bidder, whereas the remaining 5km is due to be above ground, providing flexibility and diverse infrastructure.<\/p>\n<p style=\"text-align: justify;\">Additionally, building a new railway station in Cosenza as wll as essential infrastructure to support modern and safe railway operations are the contents of this tender.<\/p>\n<p style=\"text-align: justify;\">In order to simplifying construction, the Salerno\u2013Reggio Calabria route is divided into several phases and the works on Lot 1a (Battipaglia-Romagnano) and Lot 1b\/1c (Romagnano-Praia) are in progress.<\/p>\n<p style=\"text-align: justify;\">Also, in accordance with the planned schedule, the construction on Lot 2 (Praia-Paola) is underway.<\/p>\n<p style=\"text-align: justify;\">Enhancing the line capacity for passenger and freight transportation,this tunnel construction project improves regional infrastructure, promotes economic growth and development, and represents a critical component of Italy\u2019s modern railway system.<\/p>\n<p style=\"text-align: justify;\">While the construction includes modern technologies, high-quality materials, and traffic management systems to improve durability, reliability, safety, and operations, it intends to align Italian transportation systems with broader European networks.<\/p>\n<p style=\"text-align: justify;\">Following completion, the tunnel construction is expected to speed up the routes for freight and passengers and change the region\u2019s appeal as a logistics hub and a travel destination.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the renovation of Italy\u2019s railway system, for construction of the Santomarco Tunnel a tender worth more than \u20ac1.6bn has been launched by Rete Ferroviaria Italiana (FS Group). The aim of this project is to boosting connections between Salerno and Reggio Calabria. Delivering a 22km double-track line between Paola and Cosenza, including 17km of underground route through the Santomarco Tunnel, will be the responsibility of a winning bidder, whereas the remaining 5km is due to be above ground, providing flexibility and diverse infrastructure. Additionally, building a new railway station in Cosenza as wll as essential infrastructure to support [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":18512,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[4555,223,4554,2070,47],"class_list":["post-18511","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-fs-group","tag-italy","tag-santomarco-tunnel-project","tag-tenders","tag-tunneling","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Italy\u2019s Santomarco Tunnel Project - FS Group issues \u20ac1.6bn tender - Tunnelingworld<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=18511\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Italy\u2019s Santomarco Tunnel Project - FS Group issues \u20ac1.6bn tender - Tunnelingworld\" \/>\n<meta property=\"og:description\" content=\"As part of the renovation of Italy\u2019s railway system, for construction of the Santomarco Tunnel a tender worth more than \u20ac1.6bn has been launched by Rete Ferroviaria Italiana (FS Group). The aim of this project is to boosting connections between Salerno and Reggio Calabria. Delivering a 22km double-track line between Paola and Cosenza, including 17km of underground route through the Santomarco Tunnel, will be the responsibility of a winning bidder, whereas the remaining 5km is due to be above ground, providing flexibility and diverse infrastructure. Additionally, building a new railway station in Cosenza as wll as essential infrastructure to support [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=18511\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-11T10:38:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/01\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"770\" \/>\n\t<meta property=\"og:image:height\" content=\"435\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rosebell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rosebell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511\"},\"author\":{\"name\":\"rosebell\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"headline\":\"Italy\u2019s Santomarco Tunnel Project &#8211; FS Group issues \u20ac1.6bn tender\",\"datePublished\":\"2025-01-11T10:38:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511\"},\"wordCount\":259,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg\",\"keywords\":[\"FS Group\",\"Italy\",\"Santomarco Tunnel Project\",\"Tenders\",\"Tunneling\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511\",\"name\":\"Italy\u2019s Santomarco Tunnel Project - FS Group issues \u20ac1.6bn tender - Tunnelingworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg\",\"datePublished\":\"2025-01-11T10:38:02+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg\",\"width\":770,\"height\":435},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=18511#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Italy\u2019s Santomarco Tunnel Project &#8211; FS Group issues \u20ac1.6bn tender\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/4d2f4182b445645aa0b79f3f43560eba\",\"name\":\"rosebell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g\",\"caption\":\"rosebell\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Italy\u2019s Santomarco Tunnel Project - FS Group issues \u20ac1.6bn tender - Tunnelingworld","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=18511","og_locale":"en_US","og_type":"article","og_title":"Italy\u2019s Santomarco Tunnel Project - FS Group issues \u20ac1.6bn tender - Tunnelingworld","og_description":"As part of the renovation of Italy\u2019s railway system, for construction of the Santomarco Tunnel a tender worth more than \u20ac1.6bn has been launched by Rete Ferroviaria Italiana (FS Group). The aim of this project is to boosting connections between Salerno and Reggio Calabria. Delivering a 22km double-track line between Paola and Cosenza, including 17km of underground route through the Santomarco Tunnel, will be the responsibility of a winning bidder, whereas the remaining 5km is due to be above ground, providing flexibility and diverse infrastructure. Additionally, building a new railway station in Cosenza as wll as essential infrastructure to support [&hellip;]","og_url":"https:\/\/tunnelingworld.com\/?p=18511","og_site_name":"Tunnelingworld","article_published_time":"2025-01-11T10:38:02+00:00","og_image":[{"width":770,"height":435,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/01\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg","type":"image\/jpeg"}],"author":"rosebell","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rosebell","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=18511#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=18511"},"author":{"name":"rosebell","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"headline":"Italy\u2019s Santomarco Tunnel Project &#8211; FS Group issues \u20ac1.6bn tender","datePublished":"2025-01-11T10:38:02+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=18511"},"wordCount":259,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=18511#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/01\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg","keywords":["FS Group","Italy","Santomarco Tunnel Project","Tenders","Tunneling"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=18511","url":"https:\/\/tunnelingworld.com\/?p=18511","name":"Italy\u2019s Santomarco Tunnel Project - FS Group issues \u20ac1.6bn tender - Tunnelingworld","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=18511#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=18511#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/01\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg","datePublished":"2025-01-11T10:38:02+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba"},"breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=18511#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=18511"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=18511#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/01\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2025\/01\/Italys-Santomarco-Tunnel-Project_-FS-Group-issues-E1.6bn-tender.jpg","width":770,"height":435},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=18511#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"Italy\u2019s Santomarco Tunnel Project &#8211; FS Group issues \u20ac1.6bn tender"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/4d2f4182b445645aa0b79f3f43560eba","name":"rosebell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b92c3f35ab56dec639479a669ce3f5158c2ac3b5cf54852fc3df01779a0812?s=96&d=mm&r=g","caption":"rosebell"},"url":"https:\/\/tunnelingworld.com\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18511"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18511\/revisions"}],"predecessor-version":[{"id":18513,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18511\/revisions\/18513"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/18512"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}