{"id":18413,"date":"2024-12-16T11:31:13","date_gmt":"2024-12-16T11:31:13","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=18413"},"modified":"2024-12-16T11:31:13","modified_gmt":"2024-12-16T11:31:13","slug":"poland-masovia-pl-29","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=18413","title":{"rendered":"Poland, Masovia &#8211; pl\/29"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for scientific and technical supervision with elements of investor control for the project involving the construction of the S7 expressway between Kie\u0142pin and Trasa Armii Krajowej in Warsaw, including two tunnels, under Bielany (1000 m) and under Bemowo (1100 m).<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this contract is 48 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/gddkia.eb2b.com.pl\/open-preview-auction.html\/459050\/pelnienie-nadzoru-naukowo-technicznego-z-elementami-kontroli-inwestorskiej-dla-inwestycji-polegajacej-na-budowie-drogi-ekspresowej-s7-na-odcinku-kielpin-trasa-armii-krajowej-w-warszawie\">here<\/a> and <a href=\"https:\/\/ted.europa.eu\/en\/notice\/-\/detail\/744243-2024.%20Ref.n.%20O\/WA.D-3.2411.24.2024.%2049\/24\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<\/p>\n<p style=\"text-align: justify;\">GDDKiA (Generalna Dyrekcja Dr\u00f3g Krajowych i Autostrad), Warsaw<\/p>\n<p style=\"text-align: justify;\">Tel: +48 222092391<\/p>\n<p style=\"text-align: justify;\">Email: <a href=\"mailto:mbogusz@gddkia.gov.pl\">mbogusz@gddkia.gov.pl<\/a><\/p>\n<p style=\"text-align: justify;\">Deadline:14\/01\/2025<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for scientific and technical supervision with elements of investor control for the project involving the construction of the S7 expressway between Kie\u0142pin and Trasa Armii Krajowej in Warsaw, including two tunnels, under Bielany (1000 m) and under Bemowo (1100 m). The determined time duration for this contract is 48 months. The related tender documents are attached here and here. For further information, please contact: GDDKiA (Generalna Dyrekcja Dr\u00f3g Krajowych i Autostrad), Warsaw Tel: +48 222092391 Email: mbogusz@gddkia.gov.pl Deadline:14\/01\/2025<\/p>\n","protected":false},"author":5,"featured_media":18414,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001],"tags":[3194,4503,260,4504,204,47],"class_list":["post-18413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","tag-expressway","tag-kielpin-and-trasa-armii-krajowej","tag-poland","tag-scientific-and-technical-supervision","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18413"}],"version-history":[{"count":1,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18413\/revisions"}],"predecessor-version":[{"id":18415,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/18413\/revisions\/18415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/18414"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}