{"id":17027,"date":"2024-06-13T07:01:48","date_gmt":"2024-06-13T07:01:48","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=17027"},"modified":"2024-06-13T07:01:48","modified_gmt":"2024-06-13T07:01:48","slug":"breakthrough-nepalese-hydro-project-patel-engineering","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=17027","title":{"rendered":"Breakthrough on Nepalese Hydro Project"},"content":{"rendered":"<p style=\"text-align: justify;\">With attendance of Nepal\u2019s prime minister, Pushpa Kamal Dahal, the final breakthrough on Nepalese Hydro Project, of the 9.5m diameter tunnel took place on the 3.1km section between Face 4 and Face 5 and marked completion of the 8.7km head race tunnel by <a href=\"https:\/\/pateleng.com\/\" target=\"_blank\" rel=\"noopener\">Patel Engineering Ltd<\/a>, as this company has reported on LinkedIn.<\/p>\n<p style=\"text-align: justify;\">Also, Arun-3 is SJVN Arun-III Power Development Company\u2019s 900MW run-of-the-river hydropower project on the Arun River in the Sankhuwasabha district of Nepal.<\/p>\n<p style=\"text-align: justify;\">Construction of the 8.7km head race tunnel, a surge shaft, a butterfly valve chamber, two pressure shafts as well as an underground power house complex, are the works of <a href=\"https:\/\/pateleng.com\/\" target=\"_blank\" rel=\"noopener\">Patel Engineering<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With attendance of Nepal\u2019s prime minister, Pushpa Kamal Dahal, the final breakthrough on Nepalese Hydro Project, of the 9.5m diameter tunnel took place on the 3.1km section between Face 4 and Face 5 and marked completion of the 8.7km head race tunnel by Patel Engineering Ltd, as this company has reported on LinkedIn. Also, Arun-3 is SJVN Arun-III Power Development Company\u2019s 900MW run-of-the-river hydropower project on the Arun River in the Sankhuwasabha district of Nepal. Construction of the 8.7km head race tunnel, a surge shaft, a butterfly valve chamber, two pressure shafts as well as an underground power house complex, [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":17029,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42,41],"tags":[4002,2635,4003,4004,47],"class_list":["post-17027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-events","category-news","tag-arun-river","tag-nepal","tag-nepalese-hydro-project","tag-patel-engineering-ltd","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/17027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17027"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/17027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/17029"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}