{"id":16995,"date":"2024-06-11T09:38:18","date_gmt":"2024-06-11T09:38:18","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=16995"},"modified":"2024-06-11T09:38:18","modified_gmt":"2024-06-11T09:38:18","slug":"france-toulouse-fr-14","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=16995","title":{"rendered":"France, Toulouse &#8211; fr\/14"},"content":{"rendered":"<p style=\"text-align: justify;\">Deadline: 05\/07\/2024.<\/p>\n<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the supply and installation of a watertight tunnel door in tunnels on the Toulouse metro Line C.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is 34 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/www.marches-publics.info\/mpiaws\/index.cfm?fuseaction=dematEnt.login&amp;type=DCE&amp;IDM=1470340\">here<\/a><\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<\/p>\n<p style=\"text-align: justify;\">Tisseo Ingenierie, Toulouse<\/p>\n<p style=\"text-align: justify;\">Tel: +33 561144850<\/p>\n<p style=\"text-align: justify;\">Email: <a href=\"mailto:commande-publique@tisseo-ingenierie.fr\">commande-publique@tisseo-ingenierie.fr<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deadline: 05\/07\/2024. Calling enthusiasts to participate in a tender that has been announced for the supply and installation of a watertight tunnel door in tunnels on the Toulouse metro Line C. The determined time duration for this project is 34 months. The related tender documents are attached here For further information, please contact: Tisseo Ingenierie, Toulouse Tel: +33 561144850 Email: commande-publique@tisseo-ingenierie.fr<\/p>\n","protected":false},"author":5,"featured_media":16996,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4001,41],"tags":[981,2994,51,204,1704,47],"class_list":["post-16995","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contract-projects","category-news","tag-france","tag-line-c","tag-metro","tag-tender","tag-toulouse-metro","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/16995","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16995"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/16995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/16996"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}