{"id":16232,"date":"2024-04-25T07:20:19","date_gmt":"2024-04-25T07:20:19","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=16232"},"modified":"2024-04-25T07:20:19","modified_gmt":"2024-04-25T07:20:19","slug":"warsaw-metro-line-iv-poland-warsaw-pl-11","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=16232","title":{"rendered":"Warsaw Metro Line IV, Poland, Warsaw (pl\/11)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the pre-design of the Warsaw Metro Line IV, 26 km long with 23 stations, two of which are shared with the M2 and M3 respectively. The contract also includes the technical station and the Warsaw station.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is 38 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/postepowania.metro.waw.pl\/app\/demand\/notice\/public\/3728\/details\" target=\"_blank\" rel=\"noopener\">here<\/a>, <a href=\"https:\/\/ted.europa.eu\/en\/notice\/-\/detail\/224580-2024\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"https:\/\/ted.europa.eu\/en\/notice\/-\/detail\/164900-2024\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Miasto Sto\u0142eczne Warszawa, Warsaw<br \/>\nTel: +48 22 655 46 72<br \/>\nEmail: <a href=\"mailto:zam-eh@metro.waw.pl\">zam-eh@metro.waw.pl<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for the pre-design of the Warsaw Metro Line IV, 26 km long with 23 stations, two of which are shared with the M2 and M3 respectively. The contract also includes the technical station and the Warsaw station. The determined time duration for this project is 38 months. The related tender documents are attached here, here and here. For further information, please contact: Miasto Sto\u0142eczne Warszawa, Warsaw Tel: +48 22 655 46 72 Email: zam-eh@metro.waw.pl<\/p>\n","protected":false},"author":2,"featured_media":16234,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[51,260,3886,204,47,3887],"class_list":["post-16232","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-metro","tag-poland","tag-pre-design","tag-tender","tag-tunneling","tag-warsaw-metro-line-iv","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/16232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16232"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/16232\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/16234"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}