{"id":15916,"date":"2024-04-03T13:21:12","date_gmt":"2024-04-03T13:21:12","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=15916"},"modified":"2024-04-03T13:21:12","modified_gmt":"2024-04-03T13:21:12","slug":"18-month-delay-in-hrbt-expansion","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=15916","title":{"rendered":"18-Month Delay in HRBT Expansion"},"content":{"rendered":"<p style=\"text-align: justify;\">Considering that due to the unforeseen circumstances, the design-build contractor Hampton Roads Connector Partners (HRCP), which is a consortium of Dragados USA, Vinci, Flatiron Constructors, and Dodin Campenon Bernard, requested an extension in the previous year, currently the completion date for the Hampton Roads-Bridge Tunnel Expansion (HRBT) has been pushed back 18 months.<\/p>\n<p style=\"text-align: justify;\">The February 26, 2027 is scheduled date for substantial completion , while the final completion is on August 27, 2027; however, HRCP has an early completion incentive of US$90m if substantial completion is finished by September 2026.<\/p>\n<p style=\"text-align: justify;\">As the largest highway construction project in Virginia\u2019s history, the Hampton Roads Bridge-Tunnel&#8217;s value is US$3.9bn and aims to reduce congestion along a 16km corridor on the I-64 through the addition of twin, two-lane bored tunnels and the widening of four-lane segments. It is the Virginia Department of Transportation\u2019s (VDOT) first bored tunnel.<\/p>\n<p style=\"text-align: justify;\">According to statement of VDOT\u2019s Hampton Roads district engineer, Christopher Hall: &#8220;VDOT and HRCP were determined to deliver a world-class infrastructure project for the Hampton Roads region as efficiently and safely as possible. A tremendous amount of work has been accomplished to date. HRCP has achieved a multitude of unprecedented milestones to include constructing the 15-acre expansion of the North Island, reassembling the second largest TBM in North America, completing the largest continuous concrete pour in VDOT history, and boring and building nearly 90% of the first of the two new tunnels.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Considering that due to the unforeseen circumstances, the design-build contractor Hampton Roads Connector Partners (HRCP), which is a consortium of Dragados USA, Vinci, Flatiron Constructors, and Dodin Campenon Bernard, requested an extension in the previous year, currently the completion date for the Hampton Roads-Bridge Tunnel Expansion (HRBT) has been pushed back 18 months. The February 26, 2027 is scheduled date for substantial completion , while the final completion is on August 27, 2027; however, HRCP has an early completion incentive of US$90m if substantial completion is finished by September 2026. As the largest highway construction project in Virginia\u2019s history, the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":15918,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[3154,3845,47,229,1324],"class_list":["post-15916","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-delay","tag-hampton-roads-bridge-tunnel-expansion-project","tag-tunneling","tag-us","tag-vdot","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/15916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15916"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/15916\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/15918"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}