{"id":15185,"date":"2024-02-15T05:18:21","date_gmt":"2024-02-15T05:18:21","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=15185"},"modified":"2024-02-15T05:18:21","modified_gmt":"2024-02-15T05:18:21","slug":"lotz-loetz-tunnel-extension-austria-tyrol-at-73","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=15185","title":{"rendered":"L\u00f6tz\/Loetz Tunnel Extension, Austria, Tyrol (at\/73)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the following surveying services for the L\u00f6tz\/Loetz tunnel extension project on the S16 expressway: Geotechnical, as-built, control survey, base network, tunnel scan survey.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is from 22\/04\/2024 to 01\/11\/2025.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/www.provia.at\/bieterportal\/VeroeffentlichteElemente\/Verfahren\/111904\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"https:\/\/ted.europa.eu\/en\/notice\/-\/detail\/75369-2024\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;>Asfinag Baumanagement GmbH, attn Martin Jaeger, Vienna<br \/>\n&#8211; Tel: <a href=\"tel:+43664\/6010814276\">+43 664\/6010814276<\/a><br \/>\n&#8211; Email: <A href=\"mailto:martin.jaeger@asfinag.at\">martin.jaeger@asfinag.at<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for the following surveying services for the L\u00f6tz\/Loetz tunnel extension project on the S16 expressway: Geotechnical, as-built, control survey, base network, tunnel scan survey. The determined time duration for this project is from 22\/04\/2024 to 01\/11\/2025. The related tender documents are attached here and here. For further information, please contact:<\/p>\n","protected":false},"author":2,"featured_media":15189,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[373,3194,3770,3771,204,47],"class_list":["post-15185","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-austria","tag-expressway","tag-lotz-loetz-tunnel","tag-s16-expressway","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/15185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15185"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/15185\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/15189"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}