{"id":14605,"date":"2024-01-07T10:25:29","date_gmt":"2024-01-07T10:25:29","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=14605"},"modified":"2024-01-07T10:25:29","modified_gmt":"2024-01-07T10:25:29","slug":"chennai-metro-project-kaveri-tbm-tunnels-under-adyar-river","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=14605","title":{"rendered":"Chennai Metro Project &#8211; Kaveri TBM Tunnels Under Adyar River"},"content":{"rendered":"<p style=\"text-align: justify;\">Considering that on December 30, 2023 the TBM Kaveri successfully entered the Adyar River and indicated the first-ever metro tunnel beneath its waters, the Chennai Metro project celebrates a major feat. Linking the Greenways Road and Adyar Junction stations, this breakthrough will boost city connectivity. <\/p>\n<p style=\"text-align: justify;\">The launching station of Kaveri in February 2023 was Greenways Road Station in Corridor 3 contract TU02 between Kellys and Taramani of Phase II Chennai Metro Rail Project, while TBM Adyar is its partner and follows closely at 250 m and is due to join within 20 days. Both machines will tunnel under the DB Road and the iconic Thiru.Vi.Ka. Bridge, reaching Adyar Junction Station.<\/p>\n<p style=\"text-align: justify;\">For further details please visit <a href=\"https:\/\/chennaimetrorail.org\/\" target=\"_blank\" rel=\"noopener\">their website<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Considering that on December 30, 2023 the TBM Kaveri successfully entered the Adyar River and indicated the first-ever metro tunnel beneath its waters, the Chennai Metro project celebrates a major feat. Linking the Greenways Road and Adyar Junction stations, this breakthrough will boost city connectivity. The launching station of Kaveri in February 2023 was Greenways Road Station in Corridor 3 contract TU02 between Kellys and Taramani of Phase II Chennai Metro Rail Project, while TBM Adyar is its partner and follows closely at 250 m and is due to join within 20 days. Both machines will tunnel under the DB [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":14607,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[2049,55,3694,3695,47],"class_list":["post-14605","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-chennai-metro-project","tag-india","tag-kaveri-tbm","tag-tbm-adyar","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/14605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14605"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/14605\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/14607"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}