{"id":13676,"date":"2023-11-11T13:10:13","date_gmt":"2023-11-11T13:10:13","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=13676"},"modified":"2023-11-11T13:10:13","modified_gmt":"2023-11-11T13:10:13","slug":"bart-silicon-valley-phase-ii-vta-purchases-tbm-for-this-project","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=13676","title":{"rendered":"BART Silicon Valley Phase II &#8211; VTA Purchases TBM for This Project"},"content":{"rendered":"<p style=\"text-align: justify;\">In order to advancing the BART Silicon Valley Phase II Project (BSVII), the <a href=\"https:\/\/www.vta.org\/\" target=\"_blank\" rel=\"noopener\">Santa Clara Valley Transportation Authority (VTA)<\/a> has ordered a TBM, which has been manufactured by <a href=\"https:\/\/www.herrenknecht.com\/en\/\" target=\"_blank\" rel=\"noopener\">Herrenknecht<\/a> and with US$76m (\u00a362m) value is due to have a 16.5m diameter, that makes it one of the largest TBMs in the world. Stretching the heavy rail service from Berryessa\/North San Jose through Downtown San Jose into Santa Clara, the 8km tunnel will be excavated by this machine.<\/p>\n<p style=\"text-align: justify;\">The purpose of designing this TBM will be operating in areas with higher water tables and the geology of sands, gravel, silts, and clays in the South Bay, whereas its daily performance is slated to be around 9-12m and take three to four years to dig the tunnel.<\/p>\n<p style=\"text-align: justify;\">As the first rail project in the US to be constructed by a single bore, this tunnel will have an inner diameter of 14.6m and house twin tracks and three station platforms. <\/p>\n<p style=\"text-align: justify;\">The VTA&#8217;s plan is commissioning a TBM naming contest before the machine arrives in the US.<\/p>\n<p style=\"text-align: justify;\">Also the design-build contract for the tunnel and trackwork was granted to Kiewit Shea Traylor joint venture (KSTJV) in previous year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to advancing the BART Silicon Valley Phase II Project (BSVII), the Santa Clara Valley Transportation Authority (VTA) has ordered a TBM, which has been manufactured by Herrenknecht and with US$76m (\u00a362m) value is due to have a 16.5m diameter, that makes it one of the largest TBMs in the world. Stretching the heavy rail service from Berryessa\/North San Jose through Downtown San Jose into Santa Clara, the 8km tunnel will be excavated by this machine. The purpose of designing this TBM will be operating in areas with higher water tables and the geology of sands, gravel, silts, and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[2432,733,223,47,270],"class_list":["post-13676","post","type-post","status-publish","format-standard","hentry","category-news","category-project-show-case","tag-bart-silicon-valley-phase-ii-project","tag-herrenknecht-tbm","tag-italy","tag-tunneling","tag-vta","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BART Silicon Valley Phase II - VTA Purchases TBM for This Project - Tunnelingworld<\/title>\n<meta name=\"description\" content=\"In order to advancing the BART Silicon Valley Phase II Project, the VTA has ordered a TBM, which has been manufactured by Herrenknecht.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=13676\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BART Silicon Valley Phase II - VTA Purchases TBM for This Project - Tunnelingworld\" \/>\n<meta property=\"og:description\" content=\"In order to advancing the BART Silicon Valley Phase II Project, the VTA has ordered a TBM, which has been manufactured by Herrenknecht.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=13676\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-11T13:10:13+00:00\" \/>\n<meta name=\"author\" content=\"lyndamyer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lyndamyer\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676\"},\"author\":{\"name\":\"lyndamyer\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"headline\":\"BART Silicon Valley Phase II &#8211; VTA Purchases TBM for This Project\",\"datePublished\":\"2023-11-11T13:10:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676\"},\"wordCount\":210,\"commentCount\":0,\"keywords\":[\"BART Silicon Valley Phase II Project\",\"Herrenknecht TBM\",\"Italy\",\"Tunneling\",\"VTA\"],\"articleSection\":[\"News\",\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676\",\"name\":\"BART Silicon Valley Phase II - VTA Purchases TBM for This Project - Tunnelingworld\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"datePublished\":\"2023-11-11T13:10:13+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"description\":\"In order to advancing the BART Silicon Valley Phase II Project, the VTA has ordered a TBM, which has been manufactured by Herrenknecht.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=13676#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BART Silicon Valley Phase II &#8211; VTA Purchases TBM for This Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\",\"name\":\"lyndamyer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6342884849881a67ecaff94df1b6ab5c5a5d5e7d841b9d7c874bab8af9b28949?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6342884849881a67ecaff94df1b6ab5c5a5d5e7d841b9d7c874bab8af9b28949?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6342884849881a67ecaff94df1b6ab5c5a5d5e7d841b9d7c874bab8af9b28949?s=96&d=mm&r=g\",\"caption\":\"lyndamyer\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=2\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BART Silicon Valley Phase II - VTA Purchases TBM for This Project - Tunnelingworld","description":"In order to advancing the BART Silicon Valley Phase II Project, the VTA has ordered a TBM, which has been manufactured by Herrenknecht.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=13676","og_locale":"en_US","og_type":"article","og_title":"BART Silicon Valley Phase II - VTA Purchases TBM for This Project - Tunnelingworld","og_description":"In order to advancing the BART Silicon Valley Phase II Project, the VTA has ordered a TBM, which has been manufactured by Herrenknecht.","og_url":"https:\/\/tunnelingworld.com\/?p=13676","og_site_name":"Tunnelingworld","article_published_time":"2023-11-11T13:10:13+00:00","author":"lyndamyer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"lyndamyer"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=13676#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=13676"},"author":{"name":"lyndamyer","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"headline":"BART Silicon Valley Phase II &#8211; VTA Purchases TBM for This Project","datePublished":"2023-11-11T13:10:13+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=13676"},"wordCount":210,"commentCount":0,"keywords":["BART Silicon Valley Phase II Project","Herrenknecht TBM","Italy","Tunneling","VTA"],"articleSection":["News","Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=13676","url":"https:\/\/tunnelingworld.com\/?p=13676","name":"BART Silicon Valley Phase II - VTA Purchases TBM for This Project - Tunnelingworld","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"datePublished":"2023-11-11T13:10:13+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"description":"In order to advancing the BART Silicon Valley Phase II Project, the VTA has ordered a TBM, which has been manufactured by Herrenknecht.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=13676#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=13676"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=13676#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"BART Silicon Valley Phase II &#8211; VTA Purchases TBM for This Project"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee","name":"lyndamyer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6342884849881a67ecaff94df1b6ab5c5a5d5e7d841b9d7c874bab8af9b28949?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6342884849881a67ecaff94df1b6ab5c5a5d5e7d841b9d7c874bab8af9b28949?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6342884849881a67ecaff94df1b6ab5c5a5d5e7d841b9d7c874bab8af9b28949?s=96&d=mm&r=g","caption":"lyndamyer"},"url":"https:\/\/tunnelingworld.com\/?author=2"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/13676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13676"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/13676\/revisions"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}