{"id":12678,"date":"2023-09-09T11:45:24","date_gmt":"2023-09-09T11:45:24","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=12678"},"modified":"2023-09-09T11:45:24","modified_gmt":"2023-09-09T11:45:24","slug":"consortium-granted-e204-million-contract-for-slovenian-rail-development","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=12678","title":{"rendered":"Consortium Granted \u20ac204 Million Contract for Slovenian Rail Development"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"https:\/\/drugitir.si\/\" target=\"_blank\" rel=\"noopener\">2TDK<\/a>, a State-owned project business, has signed a \u20ac203.8 million deal with a consortium for building rail and tunnel systems on Slovenia\u2019s Divaca-Koper line.<\/p>\n<p style=\"text-align: justify;\">The agreement is part of a scheme to construct a second track on the principal transportation artery close to the country\u2019s Adriatic coast.<\/p>\n<p style=\"text-align: justify;\">Slovenske Zeleznice-Zeleznisko gradbeno podjeno, the local firm, is leading the consortium on the project, which comprises Kolektor IGIN, GH Holding, and YM Construction.<\/p>\n<p style=\"text-align: justify;\">The construction team will provide track and track-related equipment and obtain rolling stock for the project.<\/p>\n<p style=\"text-align: justify;\">In addition, it will install telecommunications and security systems and deploy hardware, the electrical infrastructure, and the power supply.<\/p>\n<p style=\"text-align: justify;\">The work is a part of Lot 3 of the Divaca-Koper project and is expected to be completed by December 31, 2025.<\/p>\n<p style=\"text-align: justify;\">Furthermore, the scope of the contract contains the ongoing maintenance of the installed devices and the safe operation of the line, comprising rescue operations in case of accidents.<\/p>\n<p style=\"text-align: justify;\">Regarding the more expansive project, the Slovenian government recently modified its investment calculation for the remaining works from \u20ac940 million to \u20ac1.03 billion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2TDK, a State-owned project business, has signed a \u20ac203.8 million deal with a consortium for building rail and tunnel systems on Slovenia\u2019s Divaca-Koper line. The agreement is part of a scheme to construct a second track on the principal transportation artery close to the country\u2019s Adriatic coast. Slovenske Zeleznice-Zeleznisko gradbeno podjeno, the local firm, is leading the consortium on the project, which comprises Kolektor IGIN, GH Holding, and YM Construction. The construction team will provide track and track-related equipment and obtain rolling stock for the project. In addition, it will install telecommunications and security systems and deploy hardware, the electrical [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12680,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[],"class_list":["post-12678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12678"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12678\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/12680"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}