{"id":12576,"date":"2023-08-29T05:37:43","date_gmt":"2023-08-29T05:37:43","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=12576"},"modified":"2023-08-29T05:37:43","modified_gmt":"2023-08-29T05:37:43","slug":"e105-gjonnes-tunnel-norway-ostlandet-vestlandet-no-276","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=12576","title":{"rendered":"E105 Gjonnes Tunnel, Norway, Ostlandet &#038; Vestlandet (no\/276)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for the delivery of a charging unit for heavy electric vehicles for bulk transport to be used by the turnkey contractor for contract E105 Gjonnes tunnel.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is 9 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/eu.eu-supply.com\/app\/rfq\/rwlentrance_s.asp?PID=376821&#038;B=VEGVESEN\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=496861-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margi-left: 1.5rem; margin-top: 0.75rem;\">Norwegian Public Roads Administration, attn Ingeborg Haugli, Moss<br \/>\n&#8211; Tel: <a href=\"tel:+4740236055\">+47 40236055<\/a><br \/>\n&#8211; Email: <a href=\"mailto:ingeborg.haugli@vegvesen.no\">ingeborg.haugli@vegvesen.no<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for the delivery of a charging unit for heavy electric vehicles for bulk transport to be used by the turnkey contractor for contract E105 Gjonnes tunnel. The determined time duration for this project is 9 months. The related tender documents are attached here and here. For further information, please contact: Norwegian Public Roads Administration, attn Ingeborg Haugli, Moss &#8211; Tel: +47 40236055 &#8211; Email: ingeborg.haugli@vegvesen.no<\/p>\n","protected":false},"author":2,"featured_media":12578,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[3420,3421,345,244,204,47],"class_list":["post-12576","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-delivery-of-a-charging-unit","tag-e105-gjonnes-tunnel","tag-motorway","tag-norway","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12576"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12576\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/12578"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}