{"id":12515,"date":"2023-08-20T04:53:04","date_gmt":"2023-08-20T04:53:04","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=12515"},"modified":"2023-08-20T04:53:04","modified_gmt":"2023-08-20T04:53:04","slug":"riederwald-tunnel-germany-assia-de-123-3","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=12515","title":{"rendered":"Riederwald Tunnel, Germany, Assia (de\/123)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for topographic surveys for the Riederwald tunnel (1095 m, 1025 m) on the BAB 66 (Frankfurt\/Main &#8211; Hanau). The contract is composed of 2 lots.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is 60 months.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/vergabe.autobahn.de\/NetServer\/TenderingProcedureDetails?function=_Details&#038;TenderOID=54321-Tender-189d52f9261-264e99e9a6e017ae\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=493578-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Autobahn GmbH des Bundes &#8211; NL West, Montabaur<br \/>\n&#8211; Email: <a href=\"mailto:vergabe.west@autobahn.de\">vergabe.west@autobahn.de<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for topographic surveys for the Riederwald tunnel (1095 m, 1025 m) on the BAB 66 (Frankfurt\/Main &#8211; Hanau). The contract is composed of 2 lots. The determined time duration for this project is 60 months. The related tender documents are attached here and here. For further information, please contact: Autobahn GmbH des Bundes &#8211; NL West, Montabaur &#8211; Email: vergabe.west@autobahn.de<\/p>\n","protected":false},"author":2,"featured_media":12517,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[207,345,2797,204,3397,47],"class_list":["post-12515","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-germany","tag-motorway","tag-riederwald-tunnel","tag-tender","tag-topographic-surveys","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12515"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12515\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/12517"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}