{"id":12023,"date":"2023-07-03T07:59:06","date_gmt":"2023-07-03T07:59:06","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=12023"},"modified":"2023-07-03T07:59:06","modified_gmt":"2023-07-03T07:59:06","slug":"yht-tunnel-works-to-be-completed-by-the-end-of-the-year-in-osmaneli","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=12023","title":{"rendered":"YHT Tunnel Works to be Completed by the End of the Year in Osmaneli"},"content":{"rendered":"<p style=\"text-align: justify;\">M\u00fcn\u00fcr \u015eahin, Osmaneli Mayor, shared information about the ongoing Osmaneli-Yeni\u015fehir-Bursa-Band\u0131rma-Bal\u0131kesir High-Speed Train (YHT) line works in Osmaneli district.<\/p>\n<p style=\"text-align: justify;\">He claimed that a considerable part of the 3-meter tunnel that passes beneath the district has been completed, and the final 580-meter section will be finished by the end of the year.<\/p>\n<p style=\"text-align: justify;\">Together with Da\u011fcan A\u015e General Manager Murat Polat, President \u015eahin examined the proceeding work at the last point of the tunnel. \u015eahin remarked that the remaining part of the tunnel is between the Old Water Tank and \u00c7obandere Mosque. He underlined that with the completion of the YHT line in 2025, Osmaneli district will achieve a significant value with the YHT station.<\/p>\n<p style=\"text-align: justify;\">In addition, he expressed that with the completion of the High-Speed Train line, Osmaneli&#8217;s transportation network will considerably improve, and the region will earn incredible momentum in terms of economy and tourism.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>M\u00fcn\u00fcr \u015eahin, Osmaneli Mayor, shared information about the ongoing Osmaneli-Yeni\u015fehir-Bursa-Band\u0131rma-Bal\u0131kesir High-Speed Train (YHT) line works in Osmaneli district. He claimed that a considerable part of the 3-meter tunnel that passes beneath the district has been completed, and the final 580-meter section will be finished by the end of the year. Together with Da\u011fcan A\u015e General Manager Murat Polat, President \u015eahin examined the proceeding work at the last point of the tunnel. \u015eahin remarked that the remaining part of the tunnel is between the Old Water Tank and \u00c7obandere Mosque. He underlined that with the completion of the YHT line in [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12025,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[],"class_list":["post-12023","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12023"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/12023\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/12025"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}