{"id":11815,"date":"2023-06-14T12:57:10","date_gmt":"2023-06-14T12:57:10","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=11815"},"modified":"2023-06-14T12:57:10","modified_gmt":"2023-06-14T12:57:10","slug":"india-second-breakthrough-at-agra-fort-for-agra-metro-line1","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=11815","title":{"rendered":"India \u2013 Second breakthrough at Agra Fort for Agra Metro Line1"},"content":{"rendered":"<p style=\"text-align: justify;\">The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by <a href=\"https:\/\/www.lmrcl.com\/\" target=\"_blank\" rel=\"noopener\">Uttar Pradesh Metro Rail Corporation (UPMRC)<\/a> and the consortium <a href=\"https:\/\/www.afcons.com\/en\/node\/332\" target=\"_blank\" rel=\"noopener\">Afcons Infrastructure<\/a> &#8211; <a href=\"https:\/\/www.samindia.com\/\" target=\"-blank\" rel=\"noopener\">SAM India<\/a> on 2th June 2023. Being commissioned 45days ago from Ramleela Maidan, the Robbins TBM EPB with 6.52m diameter and 95m long, reached Agra Fort Station having installed 239 rings (334m), completing the first section of the second tunnel. <\/p>\n<p style=\"text-align: justify;\">Also between 4 TBMs launched in mid-April 2023 for the construction package AGCC-02 among RBS College Ramp &#8211; Taj Mahal Ramp, Ganga is the 2nd one. In order to Design and Construction of the Tunnel from the start of the underground ramp (near Fatehabad Road Metro station) to end of the ramp after the RBS college Metro station which includes 7 underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college), in March 2022 the Afcons &#8211; SAM Consortium awarded the EUR205.33 million (INR18.20 bn) AGCC-02 contract, while the contract includes Architectural finishes, E&#038;M, TVS and ECS.   <\/p>\n<p style=\"text-align: justify;\">Additionally, in April the first TBM Yamuna, driving the parallel tunnel, following its 77days journey reached the same shaft. Responsibility of constructing around 3 km of tunnels in Agra will be up to each one of TBM Yamuna and TBM Ganga. Currently, TBM Ganga is due to be moved through Agra Fort\u2019s station box and relaunched towards the Taj Mahal Station. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by Uttar Pradesh Metro Rail Corporation (UPMRC) and the consortium Afcons Infrastructure &#8211; SAM India on 2th June 2023. Being commissioned 45days ago from Ramleela Maidan, the Robbins TBM EPB with 6.52m diameter and 95m long, reached Agra Fort Station having installed 239 rings (334m), completing the first section of the second tunnel. Also between 4 TBMs launched in mid-April 2023 for the construction package AGCC-02 among RBS College Ramp &#8211; Taj Mahal Ramp, Ganga is the 2nd one. In order [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11817,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,43],"tags":[3266,55,3267,3268,47],"class_list":["post-11815","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-show-case","tag-agra-fort-for-agra-metro-project","tag-india","tag-line-1","tag-tbm-ganga","tag-tunneling","post--single"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Agra Metro Line1 Second breakthrough at Agra Fort<\/title>\n<meta name=\"description\" content=\"The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by UPMRC on 2nd June 2023.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tunnelingworld.com\/?p=11815\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Agra Metro Line1 Second breakthrough at Agra Fort\" \/>\n<meta property=\"og:description\" content=\"The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by UPMRC on 2nd June 2023.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tunnelingworld.com\/?p=11815\" \/>\n<meta property=\"og:site_name\" content=\"Tunnelingworld\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-14T12:57:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2023\/06\/Agra-Metro-Line-Train-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1010\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"lyndamyer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lyndamyer\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815\"},\"author\":{\"name\":\"lyndamyer\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"headline\":\"India \u2013 Second breakthrough at Agra Fort for Agra Metro Line1\",\"datePublished\":\"2023-06-14T12:57:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815\"},\"wordCount\":246,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Agra-Metro-Line-Train-3.jpg\",\"keywords\":[\"Agra Fort for Agra Metro Project\",\"India\",\"Line 1\",\"TBM Ganga\",\"Tunneling\"],\"articleSection\":[\"News\",\"Project Show Case\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815\",\"name\":\"Agra Metro Line1 Second breakthrough at Agra Fort\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Agra-Metro-Line-Train-3.jpg\",\"datePublished\":\"2023-06-14T12:57:10+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\"},\"description\":\"The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by UPMRC on 2nd June 2023.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#primaryimage\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Agra-Metro-Line-Train-3.jpg\",\"contentUrl\":\"https:\\\/\\\/tunnelingworld.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Agra-Metro-Line-Train-3.jpg\",\"width\":1600,\"height\":1010,\"caption\":\"Agra Metro Line Train\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/?p=11815#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tunnelingworld.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"India \u2013 Second breakthrough at Agra Fort for Agra Metro Line1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#website\",\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/\",\"name\":\"Tunnelingworld\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tunnelingworld.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tunnelingworld.com\\\/#\\\/schema\\\/person\\\/8ddd744e434f1c1283e3fea3a42e20ee\",\"name\":\"lyndamyer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"lyndamyer\"},\"url\":\"https:\\\/\\\/tunnelingworld.com\\\/?author=2\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Agra Metro Line1 Second breakthrough at Agra Fort","description":"The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by UPMRC on 2nd June 2023.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tunnelingworld.com\/?p=11815","og_locale":"en_US","og_type":"article","og_title":"Agra Metro Line1 Second breakthrough at Agra Fort","og_description":"The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by UPMRC on 2nd June 2023.","og_url":"https:\/\/tunnelingworld.com\/?p=11815","og_site_name":"Tunnelingworld","article_published_time":"2023-06-14T12:57:10+00:00","og_image":[{"width":1600,"height":1010,"url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2023\/06\/Agra-Metro-Line-Train-3.jpg","type":"image\/jpeg"}],"author":"lyndamyer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"lyndamyer"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tunnelingworld.com\/?p=11815#article","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/?p=11815"},"author":{"name":"lyndamyer","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"headline":"India \u2013 Second breakthrough at Agra Fort for Agra Metro Line1","datePublished":"2023-06-14T12:57:10+00:00","mainEntityOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=11815"},"wordCount":246,"commentCount":0,"image":{"@id":"https:\/\/tunnelingworld.com\/?p=11815#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2023\/06\/Agra-Metro-Line-Train-3.jpg","keywords":["Agra Fort for Agra Metro Project","India","Line 1","TBM Ganga","Tunneling"],"articleSection":["News","Project Show Case"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tunnelingworld.com\/?p=11815","url":"https:\/\/tunnelingworld.com\/?p=11815","name":"Agra Metro Line1 Second breakthrough at Agra Fort","isPartOf":{"@id":"https:\/\/tunnelingworld.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tunnelingworld.com\/?p=11815#primaryimage"},"image":{"@id":"https:\/\/tunnelingworld.com\/?p=11815#primaryimage"},"thumbnailUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2023\/06\/Agra-Metro-Line-Train-3.jpg","datePublished":"2023-06-14T12:57:10+00:00","author":{"@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee"},"description":"The first tunnel breakthrough of the TBM EPB, named Ganga, for the Agra Metro Phase 1 project was celebrated by UPMRC on 2nd June 2023.","breadcrumb":{"@id":"https:\/\/tunnelingworld.com\/?p=11815#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tunnelingworld.com\/?p=11815"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tunnelingworld.com\/?p=11815#primaryimage","url":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2023\/06\/Agra-Metro-Line-Train-3.jpg","contentUrl":"https:\/\/tunnelingworld.com\/wp-content\/uploads\/2023\/06\/Agra-Metro-Line-Train-3.jpg","width":1600,"height":1010,"caption":"Agra Metro Line Train"},{"@type":"BreadcrumbList","@id":"https:\/\/tunnelingworld.com\/?p=11815#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tunnelingworld.com\/"},{"@type":"ListItem","position":2,"name":"India \u2013 Second breakthrough at Agra Fort for Agra Metro Line1"}]},{"@type":"WebSite","@id":"https:\/\/tunnelingworld.com\/#website","url":"https:\/\/tunnelingworld.com\/","name":"Tunnelingworld","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tunnelingworld.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tunnelingworld.com\/#\/schema\/person\/8ddd744e434f1c1283e3fea3a42e20ee","name":"lyndamyer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"lyndamyer"},"url":"https:\/\/tunnelingworld.com\/?author=2"}]}},"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/11815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11815"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/11815\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/11817"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}