{"id":11522,"date":"2023-05-24T12:26:35","date_gmt":"2023-05-24T12:26:35","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=11522"},"modified":"2023-05-24T12:26:35","modified_gmt":"2023-05-24T12:26:35","slug":"e39-tunnels-norway-vestland-no-220","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=11522","title":{"rendered":"E39 Tunnels, Norway, Vestland (no\/220)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for rock securing, mainly with bolts and concrete, in the following tunnels Bomlafjord (7900 m) on E39 in Vestland County; Byfjord (5800 m),  Hklepp (609 m) and Mastrafjord (4400m) on E39 in Rogaland County.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is from 10\/08\/2023 to 30\/06\/2024 and the awarded contract budget is  is EUR 10.26 million (NOK120 million), excluding VAT.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/eu.eu-supply.com\/app\/rfq\/rwlentrance_s.asp?PID=364516&#038;B=VEGVESEN\" target=\"_blank\" rel=\"noopener\">here<\/a>, <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=281227-2023\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=281227-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-top: 0.75rem; margin-left: 1.5rem;\">Norwegian Public Roads Administration, attn Linda Kristine Brandskogsand, Moss<br \/>\n&#8211; Tel: <a href=\"tel:+4748059437\">+47 48059437<\/a><br \/>\n&#8211; Email: <a href=\"mailto:linda.brandskogsand@vegvesen.no\">linda.brandskogsand@vegvesen.no<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for rock securing, mainly with bolts and concrete, in the following tunnels Bomlafjord (7900 m) on E39 in Vestland County; Byfjord (5800 m), Hklepp (609 m) and Mastrafjord (4400m) on E39 in Rogaland County. The determined time duration for this project is from 10\/08\/2023 to 30\/06\/2024 and the awarded contract budget is is EUR 10.26 million (NOK120 million), excluding VAT. The related tender documents are attached here, here and here. For further information, please contact: Norwegian Public Roads Administration, attn Linda Kristine Brandskogsand, Moss &#8211; Tel: +47 48059437 &#8211; [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11524,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[3201,159,244,204,47,3202],"class_list":["post-11522","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-bomlafjord-tunnel","tag-highway","tag-norway","tag-tender","tag-tunneling","tag-vestland","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/11522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11522"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/11522\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/11524"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}