{"id":11270,"date":"2023-05-02T12:28:55","date_gmt":"2023-05-02T12:28:55","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=11270"},"modified":"2023-05-02T12:28:55","modified_gmt":"2023-05-02T12:28:55","slug":"rauheberg-tunnel-germany-national-de-160","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=11270","title":{"rendered":"Rauheberg Tunnel, Germany, National (de\/160)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for 1st construction phase of the partial renewal of the Rauheberg tunnel (5210 m) at Kassel on the Hannover-Wurzburg high-speed line.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is from 01\/11\/2023 to 31\/10\/2024.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"https:\/\/bieterportal.noncd.db.de\/evergabe.bieter\/api\/external\/deeplink\/subproject\/0210baf2-1d1e-49fd-b43e-8c19b486da4f\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=237000-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">DB Netz AG, attn Josip Peraica, Frankfurt am Main<br \/>\nTel: <a href=\"tel:+496926523916\">+49 6926523916<\/a><br \/>\nFax: +49 06926520071<br \/>\nEmail: <a href=\"mailto:josip.peraica@deutschebahn.com\">josip.peraica@deutschebahn.com<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for 1st construction phase of the partial renewal of the Rauheberg tunnel (5210 m) at Kassel on the Hannover-Wurzburg high-speed line. The determined time duration for this project is from 01\/11\/2023 to 31\/10\/2024. The related tender documents are attached here and here. For further information, please contact: DB Netz AG, attn Josip Peraica, Frankfurt am Main Tel: +49 6926523916 Fax: +49 06926520071 Email: josip.peraica@deutschebahn.com<\/p>\n","protected":false},"author":2,"featured_media":11272,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[207,323,3144,3145,204,47],"class_list":["post-11270","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-germany","tag-high-speed-railway","tag-kassel-on-the-hannover-wurzburg-high-speed-line","tag-rauheberg-tunnel","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/11270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11270"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/11270\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/11272"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}