{"id":10755,"date":"2023-03-07T11:13:35","date_gmt":"2023-03-07T11:13:35","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=10755"},"modified":"2023-03-07T11:13:35","modified_gmt":"2023-03-07T11:13:35","slug":"a8-innkreis-motorway-austria-upper-austria-styria-at-79","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=10755","title":{"rendered":"A8 Innkreis Motorway, Austria, Upper Austria-Styria (at\/79)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced for local construction supervision E&#038;M during the E&#038;M upgrading works of the Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is from 01\/05\/2023 to 01\/03\/2028.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/www.provia.at\/\" target=\"_blank\" rel=\"noopener\">here<\/a> and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=122337-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Asfinag, Vienna<br \/>\n&#8211; Tel: <a href=\"tel:+4305010814520\">+43 05010814520<\/a><br \/>\n&#8211; Fax: +43 05010814522<br \/>\n&#8211; Email: <a href=\"mailto:andrea.ginner@asfinag.at\">andrea.ginner@asfinag.at<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced for local construction supervision E&#038;M during the E&#038;M upgrading works of the Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway. The determined time duration for this project is from 01\/05\/2023 to 01\/03\/2028. The related tender documents are attached here and here. For further information, please contact: Asfinag, Vienna &#8211; Tel: +43 05010814520 &#8211; Fax: +43 05010814522 &#8211; Email: andrea.ginner@asfinag.at<\/p>\n","protected":false},"author":2,"featured_media":10757,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[373,159,3048,3049,204,47],"class_list":["post-10755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-austria","tag-highway","tag-innkreis-motorway","tag-steinhaus-and-noitzmuehle-twin-tube-tunnels","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/10755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10755"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/10755\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/10757"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}