{"id":10617,"date":"2023-02-25T05:39:49","date_gmt":"2023-02-25T05:39:49","guid":{"rendered":"https:\/\/tunnelingworld.com\/?p=10617"},"modified":"2023-02-25T05:39:49","modified_gmt":"2023-02-25T05:39:49","slug":"seelisberg-tunnel-switzerland-nidwalden-uri-ch-63","status":"publish","type":"post","link":"https:\/\/tunnelingworld.com\/?p=10617","title":{"rendered":"Seelisberg Tunnel, Switzerland, Nidwalden\/Uri (ch\/63)"},"content":{"rendered":"<p style=\"text-align: justify;\">Calling enthusiasts to participate in a tender that has been announced to provide support to the contracting authority and for general management during the renewal of the radio installation in the 9.3 km-long twin-tube Seelisberg tunnel on the Beckenried-Seedorf section part of the N02 motorway.<\/p>\n<p style=\"text-align: justify;\">The determined time duration for this project is from 01\/06\/2023 to 31\/12\/2025.<\/p>\n<p style=\"text-align: justify;\">The related tender documents are attached <a href=\"http:\/\/www.simap.ch\/shabforms\/servlet\/Search?NOTICE_NR=1309783\" target=\"_blank\" rel=\"noopener\">here<\/a> (German), <a href=\"http:\/\/www.simap.ch\/shabforms\/servlet\/Search?NOTICE_NR=1309849\" target=\"_blank\" rel=\"noopener\">here<\/a> (French), and <a href=\"http:\/\/ted.europa.eu\/udl?request=Seek-Deliver&#038;language=en&#038;docid=084134-2023\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p style=\"text-align: justify;\">For further information, please contact:<br \/>\n<span style=\"display: inline-block; margin-left: 1.5rem; margin-top: 0.75rem;\">Ofrou, Zofingen,<br \/>\n&#8211; Tel: <a href=\"tel:+41584696811\">+41 58 469 68 11<\/a><br \/>\n&#8211; Fax:  +41 58 469 68 90,<br \/>\n&#8211; Email: <a href=\"mailto:beschaffung.zofingen@astra.admin.ch\">beschaffung.zofingen@astra.admin.ch<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calling enthusiasts to participate in a tender that has been announced to provide support to the contracting authority and for general management during the renewal of the radio installation in the 9.3 km-long twin-tube Seelisberg tunnel on the Beckenried-Seedorf section part of the N02 motorway. The determined time duration for this project is from 01\/06\/2023 to 31\/12\/2025. The related tender documents are attached here (German), here (French), and here. For further information, please contact: Ofrou, Zofingen, &#8211; Tel: +41 58 469 68 11 &#8211; Fax: +41 58 469 68 90, &#8211; Email: beschaffung.zofingen@astra.admin.ch<\/p>\n","protected":false},"author":2,"featured_media":10619,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,41,43],"tags":[3022,345,3023,346,204,47],"class_list":["post-10617","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-news","category-project-show-case","tag-beckenried-seedorf-section","tag-motorway","tag-seelisberg-tunnel","tag-switzerland","tag-tender","tag-tunneling","post--single"],"_links":{"self":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/10617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10617"}],"version-history":[{"count":0,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/posts\/10617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=\/wp\/v2\/media\/10619"}],"wp:attachment":[{"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tunnelingworld.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}